The bridge ledge at Bérci stream, Letenye-Kistolmács 7540 bypass (2014)
Hochbordsteine, an der Verbindungsstraße Nr. 7540, zwischen Letenye und Kistolmács, bei der Bach Berci.
During the reconstruction of the Letenye-Kistolmács bypass, the conservation of the Bérci-stream bridge became necessary, which consisted of the following work processes: tearing down and rebuilding the double parapet, tearing down the asphalt, building ledges, repairing the concrete of lineage structures, as well as the completion of salt protective coatings and mastic asphalt.
« Back to the listing!
Posted: April 28, 2014