We have won the possibility to tear down and rebuild the bridge ledge at Bérci stream, Letenye-Kistolmács 7540 bypass.
We have done the teardown work, currently the ledges are being built; concrete Friday, 25 April, 2014.
« Back to the listing!
Posted: March 05, 2015